Representing President Bola Ahmed Tinubu at the groundbreaking ceremony in Ikang, Bakassi Local Government Area, Cross River State, on Friday, November 13, 2026, Vice-President Kashim Shettima formally flagged off construction of the $3.5 billion Bakassi Deep Seaport, describing the facility as a critical national infrastructure intervention designed to decongest Lagos ports and open an eastern maritime trade corridor.
- Decongesting Lagos Ports: Shettima noted that handling over 80 percent of Nigeria’s foreign trade through Lagos has strained port infrastructure and inflated logistics costs. Emphasizing complementarity over rivalry, he stated:
“Lagos is not our enemy. Lagos is our elder brother in trade. No country eats with one hand; no country carries all its loads on one shoulder. That shoulder will break when over 80 per cent of our foreign trade flows through Lagos and Lagos alone.” - Eastern Trade Corridor & Export Value Chains: Designed with a 20-metre draft to accommodate large ocean-going vessels and integrated with both a 260-kilometre superhighway and the Lagos–Calabar Coastal Highway, the port will connect the South-South, South-East, Middle Belt, and North-East to international markets. Key export commodities highlighted include Ekum cocoa, Ogoja rice, timber, solid minerals, and regional manufactured goods.
- Employment and Community Protection: The facility is projected to generate jobs across engineering, marine logistics, crane operations, haulage, customs, and ancillary services. Acknowledging Cross River State’s past territorial and oil-revenue losses following the Bakassi peninsula ruling, Shettima urged residents to shield the project from political interference and misinformation.
Governance, Approvals, and Financing Structure
| Stakeholder | Role / Institutional Responsibility | Key Milestone / Commitment |
| Federal Government / Marine & Blue Economy | Regulatory & Corridor Integration | Secured third Federal Executive Council (FEC) approval; Minister Adegboyega Oyetola confirmed hydrographic/geotechnical surveys and electronic navigational charts are complete. |
| Cross River State Government | Project Sponsor & Host | Governor Bassey Otu confirmed completion of environmental, hydrographic, geotechnical, and geophysical assessments alongside an initial $2.27 billion funding commitment under a Public-Private Partnership (PPP). |
| Afreximbank | Mandated Lead Arranger & Financial Adviser | Represented by Kanayo Awani on behalf of Bank President Dr. George Elombi; structuring the $3.5 billion PPP, de-risking early-stage development, and aligning trade flows with the African Continental Free Trade Area (AfCFTA). |
- Complementary Infrastructure Mandate: Afreximbank emphasized that maximizing the seaport’s AfCFTA trade impact depends on parallel delivery of supporting road arteries, reliable power supply, and streamlined customs administration.

